Head Start Whiteaker
Head start -Whiteaker Walk-in Cooler / Freezer -Kitchen Improvements
Self performed 85% of the work
Fabricated and installed new Portal frame
New walk-in concrete pad
New concrete equipment pad with new connections to storm
Installed owner provided walk-in cooler / freezer
Furnish and installed new exhaust fan for kitchen
Design, fabricated and installed custom steel outdoor gazebo
Installed new back bar equipment
Demo
PROJECT DETAILS
CLIENT:
Head Start Of Lane County / City of Eugene
LOCATION:
21 N Grand St Eugene
ARCHITECT/ENGINEER:
Rowell
Brokaw
SIZE/COST:
$153,390
PROJECT TYPE:
MEP / General Construction